Micky Braun's Western RR

In November of 2011 Mickey started rebuilding his new layout and now has it about 75% complete. The layout is 17 X 22 feet in HO scale and he has approximately 200 plus feet of mainline track on the two levels.  He has the lower level bench work, decking, track work, helix to upper level, and lower level fascia all constructed.  Upper level bench work is 99% done along with new plaster work that has begun; some buildings have been built and set in place. Mickey’s layout is a freelance railroad using mostly UP locomotives in the modern era.  He runs primarily freight with an occasional Front Runner train, and hopes to have some scenery constructed by the time of the tour.  Control is Digitrax DCC.  Mickey’s layout is designed for both operation and running long trains.  Cameras are allowed.